Friday, November 20, 2026
Ford Insider

Ford news, rumors, recalls, sales and deals

Super Duty / News

Ottawa and Ontario Put Over C$750 Million Behind Ford’s Super Duty Plant

Canada's federal government is putting about C$464 million into Ford's rebuilt Oakville Assembly Complex, the Ontario plant that has just started shipping Super Duty pickups, and the province is adding C$294.6 million of its own.

Gray 2026 Ford F-350 Super Duty crew cab parked at a work site
A 2026 Ford F-350 Super Duty crew cab with the Power Stroke diesel, photographed in Canada. Photo: Bull-Doser, public domain, via Wikimedia Commons

Canada’s federal government is putting about C$464 million into Ford’s rebuilt Oakville Assembly Complex, the Ontario plant that has just started shipping Super Duty pickups, and the province is adding C$294.6 million of its own.

The money backs a project Ford puts at nearly C$5 billion, which converted Oakville to build the F-Series Super Duty and added a stamping plant so that more large body panels are made in Canada. Ottawa says the work protects more than 2,000 jobs at the complex and lets it build up to 100,000 trucks a year, with output going to buyers across North America and to export markets.

Industry Minister Mélanie Joly announced the federal share in Oakville on November 20, the same day Ford confirmed its first Canadian-built Super Duty trucks were on their way to dealers. It comes from the Strategic Response Fund, a federal program for large industrial projects in sectors such as autos, steel and aluminum. The release itself gives the figure as C$464 million, while Anita Anand, the foreign minister who represents Oakville East, put it at C$464.5 million.

Aerial view of Ford's Oakville Assembly Complex in Ontario
Ford’s Oakville Assembly Complex in Oakville, Ontario. Photo: Ford

The government also tied the deal to its electrification goals by pointing to Ford’s plan for what it calls "multi-energy" versions of the Super Duty, though it gave no detail on what those trucks will be. Bev Goodman, president of Ford of Canada, said Oakville "makes Ford stronger on both sides of the border" and credited the crews in Oakville and at the engine plants in Windsor.

The terms behind the money are not public. The Logic, a Canadian business outlet, reported on November 10 that a November 2025 term sheet it obtained under access-to-information law asked Ford to keep owning and operating the Oakville plant for the length of the agreement, which runs to March 2038. The outlet said it could not confirm whether that clause survived into the final contract, and a federal spokesperson told it that contribution agreements are commercially confidential, which leaves open whether any of the money must be repaid.

The package replaces an older one. When Oakville was slated to build electric vehicles, Ottawa and Ontario had each pledged C$295 million toward a C$1.8 billion conversion, according to The Logic, before Ford switched the plant to Super Duty production in 2024.

For American buyers, the significance is supply. Ford’s Kentucky Truck Plant and Ohio Assembly had been running flat out on heavy-duty pickups and chassis cabs, and a third plant with public money committed to it until the late 2030s is a strong sign that Oakville is a long-term part of the Super Duty network rather than overflow capacity.

The Ford Insider Take

Ford gets a third Super Duty plant at a fraction of its own cost, and Canada gets a commitment it can point to while trade talks with Washington drag on. The awkward part is that a Canadian-built truck subsidized by two governments and shipped into the US is the kind of thing tariff hawks love to cite. If the 2038 ownership clause did make the final contract, Ford has effectively promised to keep building trucks in Ontario through at least two more model cycles, whatever the border looks like.

ShareXFacebookRedditEmail

Send a tip